1. pl
  2. de
  3. en

Instructions for proper swimming pool installation

 

This manual contains instructions for proper swimming pool installation

 

 

1. Before planting the basin you should dig a hole with dimensions slightly larger than the size of the pool approximately 0.5 m on each side.


2. At the bottom of the excavated bottom we pour sand mortar with cement in a ratio of 7: 1, then make very exact leveling bottom. The whole water spray.


3. We place the pool on the previously prepared surface. It is advisable to arrange the hard polystyrene foam under the whole bottom of the pool.


4. Pour about 20-25 cm of water into the pool.


5. The sides of the pool are filled with grout until the water level and mortar sand - cement is equalized. The mortar is carrefourly rinsed so that it matches perfectly to the shape of the pool

 

6. Fill up the water in the pool with another 20-25 cm.


7. Repeat points 5 an 6 until filling the pool with water.


8. The slight decrease around the pool conveys water that could come up the pool. 

 

 

For pools that are greater than 6.5 m it is necessary to make a concrete floor - 15 cm stregthened with thick armor mesh.
 

This website was created for free in WebWave.
You can also create your own free web page without coding.